A RAID register that writes itself — and still speaks PMI
Describe a problem or paste a project brief. SilverRAID classifies it as a risk, assumption, issue or dependency and drafts the full entry the way the PMBOK Guide would — you review, score, export and share.
Free: 1 register, 25 entries, 5 AI generations a month. Pro: $12 CAD/month, everything unlimited except AI (200/month).
What you get
Describe a problem → full entry
Type what is worrying you. The AI decides whether it is a risk, assumption, issue or dependency and drafts every PMI field for you to review.
Paste a brief → whole register
A charter, status report or meeting notes in; a reviewed, deduplicated register out, with a source quote on every entry.
Cause–event–effect statements
"Because of <cause>, <event> may occur, which would lead to <effect>." The grammar PMI teaches, enforced on every risk.
5×5 matrix + heat map
Probability and impact on 1–5 scales, per-objective impacts (scope, schedule, cost, quality), colour bands you can tune.
All eight response strategies
Avoid, mitigate, transfer, accept, escalate for threats; exploit, enhance, share for opportunities — with plan, trigger, contingency and fallback.
Lifecycles that match the type
Risks go identified → monitoring → closed; issues open → resolved; assumptions validated or invalidated; dependencies on track, at risk, blocked.
Audit trail
Who changed what and when, on every entry. Promote an occurred risk to an issue with one click and keep the link.
Exports your PMO already uses
Excel register with live formulas and validation lists, Word and PDF steering-committee reports, Markdown, CSV and a Jira-ready import file.
Share with the sponsor
A read-only link with an expiry and a PDF button. No seat, no login, no screenshots.
Who it is for
PM inheriting a messy project
Problem: Risks live in three decks, two emails and someone’s head.
With SilverRAID: Paste it all in; apply the register the AI proposes; walk into the next steering committee with a heat map.
PMO standardising registers
Problem: Every PM formats RAID logs differently and nobody scores the same way.
With SilverRAID: One field set, one 5×5 scale, one export — and the AI writes statements in the house grammar.
Consultant producing client packs
Problem: Monthly risk reports take a day of formatting.
With SilverRAID: Word or PDF report in one click, white-labelled on Pro.
Agile team that still reports to a sponsor
Problem: The board is in Jira; the sponsor wants a risk register.
With SilverRAID: Keep the board. Maintain the register here and push entries to Jira as a CSV when needed.
PMP candidate
Problem: Risk vocabulary is abstract until you use it.
With SilverRAID: Practise on real projects with the terms, strategies and statement grammar the exam expects.
How it compares
Competitor details as of our last check; verify current plans before you decide.
| Feature | SilverRAID | PMI Infinity | Jira risk plugins | Excel template |
|---|---|---|---|---|
| Price | $12 CAD flat | PMI membership + subscription | per user / month (plugin) | Free, manual |
| AI drafts entries from a brief | Yes | Yes | No | No |
| PMI vocabulary and statement grammar enforced | Yes | Yes | Partial | Manual |
| 5×5 heat map | Yes | No | Yes | Manual |
| Excel + Word + PDF + Jira export | Yes | Limited | Jira only | Excel only |
| Audit trail per entry | Yes | No | Yes | No |
| Sponsor share link | Yes | No | Paid seat | Email attachment |
| Canadian hosting, CAD pricing, not per seat | Yes | No | No | n/a |
Your next steering committee is closer than you think
Create a register, paste what you have, and review the AI's draft in minutes.